SCDF Submission in Singapore: Avoid These 5 Common Mistakes


 Do you plan to build, redevelop, or make changes to a building in Singapore? Then you will likely need to do SCDF submission. This is required in order to get fire safety approval from the authorities.


In this article, we will define what SCDF submission in Singapore is, why you would need it, and provide five common mistakes you should avoid to maintain your project on the right track.


What Is SCDF Submission in
Singapore?


SCDF refers to the Singapore Civil Defense Force. They are charged with making sure that buildings are fire-safe.


If you are doing any construction or renovation work related to fire safety systems, you must submit your fire safety plans to SCDF. It is referred to as SCDF submission in Singapore.


It is mandatory and missing it would result in project delays, penalties, or even legal issues.


Why Is SCDF Submission Important?


SCDF submission in Singapore is not a mere formality. It guarantees that buildings comply with Singapore's rigorous fire safety standards. SCDF inspects your:


  • Fire alarms, sprinklers, and fire extinguishers


  • Smoke control systems


  • Emergency exits and fire access routes


You will not get your Fire Safety Certificate (FSC) to hold or utilize the space if you don't get SCDF approval.


Top 5 Mistakes in SCDF Submission in Singapore


Avoiding these common errors will save your effort and time in the SCDF submission process.


1. Not Engaging a Qualified Person (QP)


Only a Qualified Person, such as a registered architect or engineer, can perform SCDF submission in Singapore.


Do it yourself or engage an unqualified person, and your submission will be rejected.


Tip: Use professional service providers such as drakofire who will walk you through each step.


2. Incomplete or Inaccurate Documents


One of the most frequent errors in SCDF submission is submitting incomplete or inaccurate documents. They are:


  • Drawings of the fire protection system

  • Layouts of smoke control and ventilation

  • Drawings of escape routes

  • Engineer endorsements

  • Ensure all your documents are prepared and checked properly before submitting.


3. Failure to Adhere to CORENET Guidelines


Submissions to SCDF have to be done through the CORENET system. Extremely tight rules exist on naming, formatting, and uploading papers.


Most of us get this wrong here, leading to delays or rejection.


Tip: Get someone who knows how CORENET works and updates himself with its latest versions.


4. Using Old Fire Code Versions


Fire codes in Singapore evolve over time. SCDF will not accept your plans should you include outdated codes within your plan.


Before you submit your SCDF Singapore, always ensure your plans are up to code with the current Fire Code.


5. Submitting Too Late


It is risky to wait until the eleventh hour to prepare your SCDF submission. You will not be in a position to make errors and rectify them, and this will postpone the whole project.


Organize in advance and begin early so that you do not experience stress at the eleventh hour.


How to Make the Process Simple


To make your SCDF submission quick and effortless, hire professionals familiar with the process from A to Z.


Reliable companies like drakofire provide end-to-end help, such as:


  • Drawing preparation and plans

  • How to submit using CORENET

  • Revising based on SCDF comments

  • Assisting you in obtaining approvals quicker

  • This saves you headaches, money, and time.


Top Frequently Asked Questions About SCDF Submission in Singapore


1. What is SCDF submission?


It is submission of fire safety plans to the Singapore Civil Defence Force for approval prior to conducting building or renovation works.


2. Who must do it?

Individuals performing building, renovation, or altering fire safety systems in a building.


3. Do I submit the SCDF myself?


No. It must be submitted by a Qualified Person (QP), i.e., a licensed professional.


4. How long does approval take?


If it is done well, it will only take 2 to 3 weeks to obtain SCDF approval.


5. What if my plans are disapproved of?


You will need to correct and resubmit, which delays the process.


Final Thoughts


SCDF submission in Singapore is the most important step that is included in all construction and renovation work. Delays are caused by mistakes, disapprovals, and even lawsuits.


To prevent that, engage the services of professionals like drakofire. They are familiar with the regulations, complete all forms for you, and get approval at short notice.


Don't set back your plans with small mistakes that delay them.